Show Navigation

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 121 images found }

Loading ()...

  • Powerlight team
    _ALC1477.jpg
  • Powerlight technician checks solar panels? angle to access if it is complying to the necessary tolerance.
    p1318610.jpg
  • PowerLight CEO Tom Dinwoodie talks with U.S. ambassador to the Portugal, Alfred Hoffman
    _ALC1215.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9910.jpg
  • PowerLight CEO Tom Dinwoodie talks with U.S. ambassador to the Portugal, Alfred Hoffman
    _ALC1412.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9920.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9917.jpg
  • Doug Felmann, Powerlight Operations and Maintenance Manager checks system before proceeding with electrical testing.
    _alc9785.jpg
  • PowerLight CEO Tom Dinwoodie
    _ALC1292.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9933.jpg
  • Doug Felmann, Powerlight Operations and Maintenance Manager checks system connections before proceeding with electrical testing.
    _alc9639.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9941.jpg
  • Doug Felmann, Powerlight Operations and Maintenance Manager checks system connections before proceeding with electrical testing.
    _alc9711.jpg
  • _ALC2094.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1523.jpg
  • Solar power plant landscape view, with olive trees in the foreground.<br />
The plant is located near Brinches, a small rural village, and built in farmland.
    _alc9602.jpg
  • Meteorological station. PowerTracker system senses sun movement based on this device and moves solar panels from eastwards to westwards orientation.
    _alc9307.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1958.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1893.jpg
  • Aerial view of Serpa solar power plant.
    _alc0263.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1523.jpg
  • Serpa's plant substation
    _ALC1909.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1518.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1214.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1548.jpg
  • Solar panels fixings are checked and bolts re-tightened.
    _alc9967.jpg
  • During winter, at mid afternoon panels are angled at 45º for best performance.
    _alc9893.jpg
  • Solar panel patterns.
    _alc9756.jpg
  • Workers fit electrical plugs on the last rows of panels, on the almost finished world?s largest solar power plant.
    _alc9507.jpg
  • Mid morning, panels are angled at somewhere near 30º for best performance.
    _alc9372.jpg
  • Solar panel patterns.
    _alc9367.jpg
  • Solar panel patterns.
    _alc9351.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2072.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1980.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1635.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1594.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1535.jpg
  • Manuel Pinho, Economy Minister of Portugal
    _ALC1449.jpg
  • GE Energy Financial Services managing director Kevin Walsh interviewd by Tood Woody, from Business 2.0 magazine.
    _ALC1438.jpg
  • _ALC1384.jpg
  • Manuel Pinho, Economy Minister of Portugal
    _ALC1351.jpg
  • Manuel Pinho, Economy Minister of Portugal
    _ALC1222.jpg
  • GE Energy Financial Services managing director Kevin Walsh talks with U.S. ambassador to the Portugal, Alfred Hoffman
    _ALC1187.jpg
  • Solar power plant landscape view.<br />
The plant is located near Brinches, a small rural village, and built in farmland.
    _alc0161.jpg
  • Solar panels fixings are checked and bolts re-tightened.
    _alc0045.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1901.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1518.jpg
  • Aerial view of Serpa solar power plant.
    _alc0236.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2037.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1943.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1730.jpg
  • A local shepherd seems amused with all the rush around Serpa's power plant
    _ALC1678.jpg
  • Manuel Pinho, Economy Minister of Portugal and GE Kevin Walsh dedicate Serpa's power plant.
    _ALC1403.jpg
  • Solar panels fixings are checked and bolts re-tightened.
    _alc0065.jpg
  • A local villager watches plant?s trucks passing-by at Brinches, the neighbouring village.
    _alc9808.jpg
  • Workers fit electrical plugs on the last rows of panels, on the almost finished world?s largest solar power plant.
    _alc9465.jpg
  • Electrical control device, at substation.
    _alc9437.jpg
  • Early morning, panels are angled at 45º for best performance.
    _alc9294.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2163.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1952.jpg
  • Serpa's plant substation
    _ALC1925.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1812.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1720.jpg
  • Signature of finantial contracts between Portuguese Government and GE
    _ALC1370.jpg
  • GE Energy Financial Services managing director Kevin Walsh
    _ALC1307.jpg
  • Winter foggy morning.<br />
At this time of the day, panels are angled at 45º for the best performance.
    _alc0134.jpg
  • Substation equipment
    _alc0096.jpg
  • Construction is finishing. Road workers spread sand over tout-venant.
    _alc0016.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2106.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1731.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1599.jpg
  • Solar panels fixings are checked and bolts re-tightened.
    _alc0039.jpg
  • Construction is finishing. Road workers spread sand over tout-venant.
    _alc9994.jpg
  • During winter, at mid afternoon panels are angled at 45º for best performance.
    _alc9873.jpg
  • Brinches, the neighbouring village.
    _alc9835.jpg
  • Solar panel patterns.
    _alc9741.jpg
  • Workers fit electrical plugs on the last rows of panels, on the almost finished world?s largest solar power plant.
    _alc9544.jpg
  • Solar panel patterns.
    _alc9380.jpg
  • Mid morning, panels are angled at somewhere near 30º for best performance.
    _alc9348.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2024.jpg
  • _ALC2019.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2011.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1977.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1797.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1685.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1658.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1599.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1548.jpg
  • Manuel Pinho, Economy Minister of Portugal
    _ALC1360.jpg
  • Aerial view of Serpa solar power plant. <br />
On the left, Brinches, nearby village.
    _alc0227.jpg
  • Solar power plant landscape view.<br />
The plant is located near Brinches, a small rural village, and built in farmland.
    _alc0148.jpg
  • PowerTracker device. This system senses the sun movement and moves the panels from East to West, using an engine with micromovement in order to get the best possible performance during the day.
    _alc0146.jpg
  • Winter foggy morning.<br />
At this time of the day, panels are angled at 45º for the best performance.
    _alc0132.jpg
  • Substation
    _alc0109.jpg
  • Substation masts at dusk
    _alc0083.jpg
  • Solar panel patterns.
    _alc9395.jpg
  • During winter, at mid afternoon panels are angled at 45º for best performance.
    _alc9867.jpg
  • Early morning, panels are angled near 45º for best performance.
    _alc9862.jpg
  • Typical Alentejo architecture at Brinches, the neighbouring village.
    _alc9829.jpg
  • Serpa's plant substation
    _ALC1922.jpg
Next
  • Facebook
  • Twitter
x

4SEE Photographers

  • Portfolio
  • JUMP TO EDITORIAL WEBSITE
  • About
  • Contact
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area