Show Navigation

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 121 images found }

Loading ()...

  • Serpa's plant substation
    _ALC1909.jpg
  • Aerial view of Serpa solar power plant.
    _alc0263.jpg
  • Serpa's plant substation
    _ALC1922.jpg
  • Manuel Pinho, Economy Minister of Portugal and GE Kevin Walsh dedicate Serpa's power plant.
    _ALC1403.jpg
  • Aerial view of Serpa solar power plant.
    _alc0247.jpg
  • Aerial view of Serpa solar power plant.
    _alc0236.jpg
  • Serpa's plant substation
    _ALC1925.jpg
  • Aerial view of Serpa solar power plant. <br />
On the left, Brinches, nearby village.
    _alc0227.jpg
  • A local shepherd seems amused with all the rush around Serpa's power plant
    _ALC1678.jpg
  • Aerial view of Serpa solar power plant.
    _alc0224.jpg
  • Aerial view of Serpa solar power plant.
    _alc0335.jpg
  • Electrical control device, at substation.
    _alc9437.jpg
  • Signature of finantial contracts between Portuguese Government and GE
    _ALC1370.jpg
  • Construction is finishing. Road workers spread sand over tout-venant.
    _alc0016.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9941.jpg
  • During winter, at mid afternoon panels are angled at 45º for best performance.
    _alc9873.jpg
  • Early morning, panels are angled near 45º for best performance.
    _alc9862.jpg
  • Solar power plant landscape view, with olive trees in the foreground.<br />
The plant is located near Brinches, a small rural village, and built in farmland.
    _alc9602.jpg
  • Workers fit electrical plugs on the last rows of panels, on the almost finished world?s largest solar power plant.
    _alc9507.jpg
  • Electrical control device, at substation.
    _alc9436.jpg
  • Meteorological station. PowerTracker system senses sun movement based on this device and moves solar panels from eastwards to westwards orientation.
    _alc9307.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1958.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1905.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1685.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1656.jpg
  • _ALC1384.jpg
  • U.S. ambassador to the Portugal, Alfred Hoffman
    _ALC1328.jpg
  • Manuel Pinho, Economy Minister of Portugal
    _ALC1222.jpg
  • Powerlight technician checks solar panels? angle to access if it is complying to the necessary tolerance.
    p1318610.jpg
  • Winter stormy day.<br />
Even under these weather conditions, PowerTracker system senses sun movement and angles the panels for the best performance.
    _alc9562.jpg
  • Solar panels fixings are checked and bolts re-tightened.
    _alc0039.jpg
  • Solar panels fixings are checked and bolts re-tightened.
    _alc9967.jpg
  • Solar panel patterns.
    _alc9756.jpg
  • Solar panel patterns.
    _alc9741.jpg
  • Workers fit electrical plugs on the last rows of panels, on the almost finished world?s largest solar power plant.
    _alc9544.jpg
  • Solar panel patterns.
    _alc9380.jpg
  • Mid morning, panels are angled at somewhere near 30º for best performance.
    _alc9372.jpg
  • Solar panel patterns.
    _alc9367.jpg
  • _ALC2094.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2072.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1980.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1952.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1720.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1635.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1523.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1518.jpg
  • Manuel Pinho, Economy Minister of Portugal
    _ALC1449.jpg
  • GE Energy Financial Services managing director Kevin Walsh interviewd by Tood Woody, from Business 2.0 magazine.
    _ALC1438.jpg
  • PowerLight CEO Tom Dinwoodie talks with U.S. ambassador to the Portugal, Alfred Hoffman
    _ALC1412.jpg
  • GE Energy Financial Services managing director Kevin Walsh
    _ALC1307.jpg
  • PowerLight CEO Tom Dinwoodie
    _ALC1292.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1214.jpg
  • PowerLight CEO Tom Dinwoodie talks with U.S. ambassador to the Portugal, Alfred Hoffman
    _ALC1215.jpg
  • GE Energy Financial Services managing director Kevin Walsh talks with U.S. ambassador to the Portugal, Alfred Hoffman
    _ALC1187.jpg
  • Winter foggy morning.<br />
At this time of the day, panels are angled at 45º for the best performance.
    _alc0134.jpg
  • Winter foggy morning.<br />
At this time of the day, panels are angled at 45º for the best performance.
    _alc0132.jpg
  • Substation equipment
    _alc0096.jpg
  • Solar panels fixings are checked and bolts re-tightened.
    _alc0045.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2106.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1731.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1599.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1548.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9917.jpg
  • During winter, at mid afternoon panels are angled at 45º for best performance.
    _alc9867.jpg
  • Typical Alentejo architecture at Brinches, the neighbouring village.
    _alc9829.jpg
  • A local villager watches plant?s trucks passing-by at Brinches, the neighbouring village.
    _alc9808.jpg
  • Doug Felmann, Powerlight Operations and Maintenance Manager checks system before proceeding with electrical testing.
    _alc9785.jpg
  • Workers fit electrical plugs on the last rows of panels, on the almost finished world?s largest solar power plant.
    _alc9465.jpg
  • Solar panel patterns.
    _alc9351.jpg
  • Mid morning, panels are angled at somewhere near 30º for best performance.
    _alc9348.jpg
  • Early morning, panels are angled at 45º for best performance.
    _alc9294.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2163.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1977.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1812.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1731.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1599.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1535.jpg
  • Manuel Pinho, Economy Minister of Portugal
    _ALC1351.jpg
  • Solar power plant landscape view.<br />
The plant is located near Brinches, a small rural village, and built in farmland.
    _alc0161.jpg
  • Solar power plant landscape view.<br />
The plant is located near Brinches, a small rural village, and built in farmland.
    _alc0148.jpg
  • Solar panel patterns.
    _alc9395.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2072.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1901.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1518.jpg
  • Construction is finishing. Road workers spread sand over tout-venant.
    _alc9994.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9933.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9920.jpg
  • Commissioning procedures. Doug Felmann, Powerlight Operations and Maintenance Manager checks system performance under open sunlight.
    _alc9910.jpg
  • During winter, at mid afternoon panels are angled at 45º for best performance.
    _alc9893.jpg
  • Brinches, the neighbouring village.
    _alc9835.jpg
  • Doug Felmann, Powerlight Operations and Maintenance Manager checks system connections before proceeding with electrical testing.
    _alc9639.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2024.jpg
  • _ALC2019.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC2011.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1955.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1893.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1785.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1797.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1658.jpg
  • Solar panels move during the day using PowerTracker system, following sun's movement.
    _ALC1594.jpg
Next
  • Facebook
  • Twitter
x

4SEE Photographers

  • Portfolio
  • JUMP TO EDITORIAL WEBSITE
  • About
  • Contact
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area